Delivery time
It is based on the bag quantity.
For do sample,the delivery time is about 10 days after you confirmed the design artwork and received prepayment.
For the mass production,it is based on the order quantity.for 10000pieces to 100000pieces,it will be finished within 15 days after you confirmed the design artwork and received prepayment.for 100000pieces to 300000pieces, it will be finished within 25 days after you confirmed the design artwork and received prepayment.
Payment item
By T/T.30% prepayment before production,the balance is against shipment.
Trade terms
FOB term,however CIF term is also acceptable,it is decided by clients requirements.
Package
Pp woven bag,it is packed to bundle/bale,then packed into an outside bag
PE/Nylon bag,it is packed into a carton,then packed into an outside bag
版权所有 © 2021 义乌市佳兰包装有限公司 | 版权所有